MOQ, stock and lead time: how the calendar actually runs

A minimum order is not a policy, it is a consequence. It comes from three things: the dye lot, the print plate, and the weaving run. Once a buyer knows which of the three is binding, the number stops looking arbitrary and the calendar becomes predictable.

The dye lot

A dyed-to-match colour is a batch. The dyhouse loads a machine with a fixed volume, so the minimum is whatever that volume produces in the width you want. A stock colour has no such constraint because it was dyed before you asked, which is why one roll is a valid order from stock.

The print plate or cylinder

Screen and gravure both need a plate or a cylinder made for the artwork. The cost of that tool is spread over the run, so below a certain length the ribbon becomes a tool-amortisation exercise. Digital print has no plate, which is why short runs and multi-colour designs go that way.

The weaving run

Greige ribbon is woven in runs on a loom, and a run has a length. A printer buying greige by the metre meets this constraint rather than the dye lot, and that is why greige pricing is quoted by volume.

Planning backwards from a date

Add it up in the order it happens: dip or strike-off two weeks, approval one week, bulk three to four weeks, inland and sea freight four to six weeks to Europe. A launch in twelve weeks is comfortable with a stock colour and tight with a dyed one, and impossible with a new plate and sea freight.

Colour references and stock rolls
Colour references and stock rolls

Questions this guide raises

Is a minimum negotiable?
It moves with the method. A shorter run is possible in digital print or from stock; it is not possible under a gravure cylinder. Asking which of the three constraints is binding gets a real answer faster than asking for a discount on the minimum.
Can a repeat order be smaller?
Usually yes, once the dip and the plates exist, because the tooling is already amortised. The second order is where the smaller quantity becomes economic.
How long do stock colours really take?
24 to 48 hours out of the warehouse once terms are agreed. Cut lengths over 50 m per colour add a working day because they are cut to order.

Ask about your own programme

Send the reference you want matched, the width in millimetres and the quantity per colour. You get a price, a lead time and a sample date back, usually within one working day.